IMAX 4 Wide Racing (1 Viewer)

Joe, I think the entire Zmax track (stands, track, pits) was built in less than 6 months.

that'd be 1.5 months per lane, so revised vegas should only take 3 months :D

hope he puts 4 lanes in vegas and holds huge money race...............
61 teams not on invite list. :cool:
 
that'd be 1.5 months per lane, so revised vegas should only take 3 months :D

hope he puts 4 lanes in vegas and holds huge money race...............
61 teams not on invite list. :cool:

Should take less than 2 months, That was six months from moving the first bucket of earth, before he had Concords approval, permits, or anything else, and threatening to tear down Lowes to get his way...

I wonder why I don't like Mister Smith.

d'kid
 
Should take less than 2 months, That was six months from moving the first bucket of earth, before he had Concords approval, permits, or anything else, and threatening to tear down Lowes to get his way...

I wonder why I don't like Mister Smith.

d'kid

karl, if it weren't for folks like mr. smith, there'd be more people working
gov't. jobs or not working at all - sh*t gets done because of guys like him.
you want to sit around and hold everyone's hand waiting for permission
on every last little detail, you'll be on the sidelines of life my friend.
 
I don't know about Minnesota, but everywhere I've ever lived, you've needed construction permits before even thinking of building, and that includes adding to a private home, or enlarging a place of business.
 
Ways To Support Nitromater

Users who are viewing this thread


Back
Top