NitroRichFire
Nitro Member
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Bruton Smith doesn't screw around! Just removing the old concrete was a major effort in itself, and they've already placed the rebar and are going to pour concrete tomorrow. Being in the contracting business, I can tell you that they are working at an absolutely unbelievable pace.
That being said, do you think it'll be raceable when July 6-8 rolls around?
Don't want to overqualify myself on the matter. We pour 2' x 2' x 2' concrete pads for automatic gate operators. We can usually pour one day and then bolt down a gate operator the next. However, we don't run the gate operator at 330mph, so I guess I don't have the answer, lol.
There is not another pad there that is the ground. The dirt work under it was not the problem this time. The dips at the tunnels were fixed at in the first go-around, thats the only ground problem they had. And thats not the concret that caused the first re-pour this year.
That being said, do you think it'll be raceable when July 6-8 rolls around?